Error!


Javascript is required for Our World of Energy!

We use Javascript to add unique and interesting functionality to the site including menu navigation and saving your favorite pages!


Please turn Javascript on in order to continue.
Loading, please wait...
X
This is a test message!

This is a test message!
 
Floater Sizing Tool
OWOE Advanced Sizing Tool
Input
Energy TypeWind
System TypeFloating Foundation
SubtypeMono-column
LocationEurope - North Sea
Hs (design)12.7 m
Water Depth105.0 m
Turbine Power Rating6.0 MW
Number of Platforms5
Distance to Shore25.0 km
Type Substation
Number of Substations0
Start Over Update Input Save Scenario
Scenarios Saved: 0 /


Output
Platforms:
Payload726 mt
Hull Displacement11,488 mt
Turbine:
Hub Height95.3 m
Rotor Diameter133.5 m
Turbine Base Diameter6.8 m
Platform Cost (avg)$51.7 million
 
Substations:
Type Substation
 
Wind Farm:
Total Power30.0 MW
Number of rows1
Number of columns5
Row spacing (8D)1,068 m
Col spacing (6D)801 m
Transmission System
 
Platform Cost (total)$258.5 million
Substation Cost (total)$0.0 million
Trans Sys Cost (total)$43.2 million
Wind Farm Cost (total)$301.7 million
 
Project Duration47.4 months

Duration = start of FEED through end of installation

Platform Hull Dimensions
Column Diameter13.3 m
Column Height96.1 m
 
Draft81.0 m
Freeboard15.1 m
 


These dimensions and costs are based on a very limited number of floating wind facilities, all of which are prototypes or demonstration facilities at this time. Results should only be used as best estimates at this time. Do not sanction or build a platform using this data.


For help in sizing a platform to meet your unique requirements, please contact:

www.vloffshore.com
(713) 766-6765


If you like OWOE's platform sizing tool, you can access advanced sizing features by becoming a registered OWOE user. Click here to login or register in order to access advanced features such as weight and cost breakdowns, execution strategies, and project schedules:
Login / Register


Platform Execution Strategy (International)
Activity Type or Location
Platform Fabrication Location Spain
Platform Fabrication Type land skidways
Platform Loadout Type loadout to barge
Platform Tow Preparation float-off barge / float-on transport vessel
Platform Ocean Transport dry transport to offshore site (2,408 km)
Platform Offload Type float-off transport vessel
Platform Special Activity hull upend at site
Turbine Installation offshore lift
Mooring Fabrication Location N Europe
Payload, Weight and Capital Cost (CAPEX) Breakdown
Component Payload (mt) Weight (mt) Avg Cost Each ($m) Cost Total ($m)
Development 0.6 3.2
Engineering 2.3 11.7
Turbine 726 726 10.7 53.5
Hull 2,909 18.9 94.7
Fixed ballast 1.9 9.4
Mooring (incl transportation) 1.6 8.0
Transportation (platform) 0.3 1.5
Installation (incl turbine) 10.1 50.4
Offshore HUC 0.5 2.4
Financing (platforms) 4.7 23.6
Wind Platform Total 726 3,634 51.7 258.5
MVAC Intrafield Cables 0.0
Cables to Shore 0.0
Onshore Equipment 0.0
Financing (transmission system) 0.0
Transmission System Total 43.2
Wind Farm Total 301.7
1) To the extent possible, costs are aligned with NREL guidance (2015).
2) Individual platform costs are for the average cost of a fleet of 5 wind platforms and use
learning curve improvements for all platform components.
3) Development costs include permitting, front-end engineering, and infrastructure
improvements (ports and staging).
4) Installation costs assume a single mobilization of a class 2 vessel and no vessel idle time;
therefore, platform delivery must be optimized to avoid significant idle time and associated cost.
5) Finance costs include insurance, decommissioning fund, loan origination fee, and capitalized
interest based notionally on a loan with a 10-year term, 50% debt-to-value, 4.5% interest, and 5%
fees. The impact of other loan assumptions can be examined via the LCoE evaluation.
6) Transmission system finance costs include all components, including substations.
7) Costs exclude contingency, corporate overhead and profit.
Execution Schedule Summary
Milestone / Activity Start (months) Duration (months) End (months) Activity Display
Project Start 0.0

Pre-FEED 0.0 12.0 12.0

FEED 12.0 9.0 21.0

 
 
 
 
 
 
 
 
 
 
 
 

Issue Bid 21.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Bid, Solicit, Award 21.0 6.0 27.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Project Sanction 26.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Award Contracts 27.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Detailed Engineering 21.0 12.0 33.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Topsides Equipment and Turbine Procurement (1st platform) 27.0 12.0 39.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Fabrication (1st platform) 27.0 11.1 38.1

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Loadout (1st platform) 38.1 0.9 39.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Sailaway 39.0

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Transportation (1st platform) 39.0 0.7 39.7

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Mooring System Procurement (1st platform) 27.0 14.8 41.8

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Mooring System Installation (1st platform) 41.8 0.1 41.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Installation (1st platform, incl hull upend) 41.9 0.6 42.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Stormsafe 42.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Offshore Hook-up and Commissioning (1st platform) 42.4 0.5 42.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Commercial Operation Date (Ready to Energize 1st platform) 42.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Topsides Equipment and Turbine Procurement (remainder) 39.0 0.9 39.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Fabrication (remainder) 38.1 6.8 44.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Loadout and Transportation (remainder) 39.7 6.8 46.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Mooring System Procurement (remainder) 41.8 1.8 43.6

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Platform Installation (remainder - hull upend, mooring, platform, turbines) 42.4 4.5 46.9

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Offshore Hook-up and Commissioning (remainder) 42.9 4.5 47.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Ready to Energize last platform 47.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Schedule Notes:
1) This schedule is indicative of the platform execution schedule based on current industry norms; actual durations will depend
on project specifics
2) Execution schedule durations are based on fabrication of a fleet of 5 wind platforms and use learning curve improvements
for all construction and installation activities
3) Pre-FEED activities include site surveys, permitting, preliminary feasibility and engineering studies, environmental studies
and stakeholder engagement
4) The following represent opportunities to optimize the schedule as currently shown:
- Improve or expedite platform delivery - up to 2.2 months
- Improve or expedite mooring system delivery and installation - up to 2.2 months


Comparison of OWOE Parametric Sizing Algorithms to Actual Platforms - Floating Wind
(values represent ratio of sizing algorithm to platform actuals - color indicates quality of the comparison: green best (+-5%) -> yellow (+-10%) -> orange (+-15%) -> purple (+-25%) -> red worst (>25%), blanks no data)
 
    Platform Displacement   Column Dimension   Span   Draft   Hull Wt
Development Name   Using Actual Displacement Using Specified Payloads Using Advanced Relationships Using Simple Relationships   Using Actual Displacement Using Specified Payloads Using Advanced Relationships Using Simple Relationships   Using Actual Displacement Using Specified Payloads Using Advanced Relationships Using Simple Relationships   Using Actual Displacement Using Specified Payloads Using Advanced Relationships Using Simple Relationships   Using Actual Displacement Using Specified Payloads Using Advanced Relationships Using Simple Relationships
WindFloat - 2 mw prototype   1.00 1.00   1.00 1.00   1.00 1.00   1.00 1.00  
WindFloat - 6 mw production   1.00 1.00   1.01 1.01   0.98 0.98   0.98 0.98  
Hywind - 2.3 mw prototype   1.00 1.00   1.24 1.24     0.66 0.66  
Hywind - 6 mw production   1.00 1.00   0.95 0.95     1.08 1.08  
VLO Y-Wind 3 mw   1.00 1.00   0.99 0.98   1.06 1.06   1.02 1.02  
VLO Y-Wind 5 mw   1.00 0.95   1.01 0.99   0.95 0.93   0.99 0.97  
VLO Y-Wind 8 mw   1.00 1.01   1.01 1.01   1.00 1.00   0.99 0.99  
Average   1.00 0.99   1.03 1.02   1.00 0.99   0.96 0.96  
Standard Deviation   0.02   0.09 0.10   0.04 0.05   0.14 0.14  


Key Dimensions Diagram
13.3 m
81.0 m
96.1 m
95.3 m
133.5 m